IPMVP Options: International Performance Measurement & Verification Protocol

IPMVP Options & Protocol

As companies across the world continue to look for ways to cut their energy consumption, the requirement for confidence in these methods has never been of greater importance. Therefore, the measurement & verification of energy savings has become a key requirement of any modern day energy performance related contract. Given the importance of this, an international method of measurement & verification was inevitable, leading to the ‘International Performance Measurement & Verification Protocol’ or more commonly known as IPMVP.

Why IPMVP?

Traditionally, the biggest barrier to the implementation of energy efficiency projects was the uncertainty regarding the estimation of energy savings. This had a profound effect on the willingness of parties to invest the relevant capital required to undertake such projects. In the mid 1990’s a coalition of North America’s leading energy efficiency experts, led by the United States Department of Energy, published the North American Energy Measurement and Verification Protocol (NEMVP).
Later in the decade, this version of the protocol was updated to include measurement and verification methods for water efficiency projects. This then became known as the ‘International Performance Measurement & Verification Protocol’ or IPMVP.
IPMVP was introduced as a guideline methodology by which the energy savings achieved from energy efficiency projects could be measured and verified in a consistent and reliable manner.

What is IPMVP?
IPMVP sets out four different options for determining project savings. The type of option chosen will vary from project to project. They are:

  • Option A – Retrofit Isolation:

This particular option allows for the estimation of a key parameter. A good example of this would be a lighting retrofit, where the power drawn can be measured and the operational hours can be estimated.
NOTE: Any estimates should be agreed by all parties before commencing the project and written into the M&V plan.

  • Option B – Retrofit Isolation:

This differs from Option A as all parameters associated with the energy conservation measure must be measured and cannot be estimated. For example, consider the installation of a variable speed drive. The power drawn as well as the hours of operation will have to be measured in order to determine any energy savings.

  • Option C – Whole Facility:

This approach is taken where the energy use of the whole facility or sub facility e.g. extension area is needed to be measured. A number of independent variables may need to be taken into account such as heating/cooling degree days or production data. Option C is of great benefit where a number of energy conservation measures have been introduced and the overall picture for the facility is required.

  • Option D – Calibrated Simulation:

This approach is taken where no historical data is available i.e. there is no data available for the baseline period. In this case, energy performance for the facility or sub facility is modelled through simulation.
This particular option requires a much more skilled approach, and as a result, is generally more expensive.

Energy Efficiency Obligation Scheme (EEOS)

In accordance with the ‘Energy Efficiency Directive 2012’ there is a legal obligation on EU member states to achieve new energy savings year on year from the period of January 1st 2014 – December 31st 2020. Ireland has implemented the ‘Energy Efficiency Obligation Scheme’ or ‘EEOS’ in response to this. Under the EEOS, all energy sales companies and energy distributors with market sales in Ireland exceeding 600GWh are obliged to achieve a certain level of energy savings, based on their share of the market. According to the EU Directive,
“Member states are obliged to put in place measurement, control and verification systems to verify savings by obligated parties.” – Energy Efficiency Directive (2012)
This is where IPMVP comes to the fore as a requirement for the EEOS.

Europe Wide Implementation
As stated, all EU member states are obliged to implement measures in accordance with the ‘Energy Efficiency Directive 2012’, as Ireland has done with EEOS. Other European countries have done similar through various initiatives. For more information please see;

 

Wattics and IPMVP
Wattics recently launched our IPMVP adherent measurement and verification software tool which can help you to streamline your energy efficiency and conservation projects. Our professionally certified measurement & verification team are working with energy services companies throughout Europe, training them to use our tool and streamline their energy saving projects. Please visit our website for more details.

Wattics and You

For more information on streamlining your energy saving projects, or if you would like to receive a free demonstration of our software, including our IPMVP-based measurement & verification tool then please contact us using the form below:

    Additional References
    International Performance Measurement & Verification Protocol, Volume 1 2012
    Energy Efficiency Directive, 2012
    Energy Efficiency Obligation Scheme (EEOS)

     

    Sign up to our blog posts

    Sign up to keep up-to-date with what’s happening within the industry

    Technology Update

    Check out our latest offering:

    “WatticsAir – Air Quality Monitoring and Analytics”
    Go to page